ANCR (non-conformance report) is where a requirement of the criteria or stan- dard to be met cannot be verified. In the event of an NCR being issued during your audit a corrective action process will commence.

The auditor will explain how SMG will follow up and clear the NCR.

The auditor will be required to close out the NCR either on or off site. This is a chargeable activity known as a Follow-up Audit. The severity of the NCR will determine if the follow up activity is conducted on or

off site. The auditor will advised at the time of raising the NCR how much time will be required to close out the NCR.